Welcome!

This site is dedicated to my model railroad, the HO scale Virginia Midland Railroad. This layout comprises a 12X9 room with two levels. The upper level is complete and the lower level scenery has just begun.

I do a handful of train shows in the Virginia/Maryland region with Makin Tracks.
I also can help you find that freight car/locomotive or other hard to find item.

Email: virginiamidlandshops@gmail.com
You tube videos: http://www.youtube.com/user/Virginiamidlandrr/

Monday, July 14, 2014

A week off from the layout: VACATION

Taking a week off from the layout and life in general to vacation with my family in the Outer Banks in NC.  I have not been down here since the mid 1980's!  During the down time, I'm going to plan out what exactly I want to complete on the layout when I get back.  Orange has ran into a dilemma.  The cassette will not provide enough room for a run-around exchange track for the VMID.  So, I may have to bring trains down to Orange double headed to work the exchange.  I do have one industry in Orange and I may still do the run-around cassette so the local doesn't have to be double headed.  If you don't know railroad lingo, double headed means a loco on the front and the rear of the train.  Some of the CSX locals in our area do this and we have a coal train that comes up from Richmond that does this also.  The coal train runs north and then runs down a branch with the rear locos without having to run around it's train.

So here's whats on the agenda when I get home:

  1. Complete trackage in Orange including wiring
  2. Complete the cassette
  3. Start on the expansion above Orange.  
  4. Complete aggregate facility (Walthers kit)
  5. Complete scenery on expansion
I want to complete the scenery on the expansion of the aggregate facility because this is the first thing you see when you come into the layout room.

Stay tuned!



Sunday, July 6, 2014

Orange continues at a good pace

I've used this holiday weekend to get as much as I can done on the lower level at Orange.  It a weird setup, like a "L" shadow box, so I have to make sure I get everything done before I cannot reach certain areas.  This includes soldering feeder wires, painting the background blue and other small tasks.  The Norfolk Southern interchange can hold 4-5 cars and the VMID interchange can hold 3 cars.  These car lengths are 50' based.
Here is the entrance to Orange.  The spur to the left goes to the NS interchange and a untreated tie loading facility.  The trackless turnout will lead to the edge of the layout and a cassette for the VMID interchange.  The toggles on the right are for the signals at City Junction above.  

The interchange track is the closest and the tie place has the gondola on it's track. 

The track the gon is on is not glued down in case I need to move it.  

Here is the hidden trackage that leads to Orange.  Had to make sure that trackage was good to go before proceeding.  

The good thing about working on this lower level is that I've done it in a chair.  By the way, operating the lower level is strictly done in the chair! 

The interchanges will be an easy reach  for operators.  This view is right by the door.  

Did I mention my office is a total wreck!  This items in the middle of the room were under the area I'm working in.

Future expansion?  Might extend this area towards the me about 2-3 feet and take out the creek and bridge scene.  This would make the aggregate area a lot bigger.  But would require another crossing of the Midland.  Stay tuned.

Friday, July 4, 2014

Happy 4th of July and quick update

Worked most of the day on the Orange area and it is a lot more work than I realized. Working in a less than ideal space between levels is no fun. I've hit my hit several times. That probably explains the bad headache I had yesterday morning. Some of the jobs include stapling wires up, running track and road bed in hard to reach places, soldering in those hard to reach places and installing lighting. The good news is that I finally figured out the trackage in this area. Here are some pics of the progress:

Here we look down the roadbed from the hidden trackage

The rest of the area:

The view block installed. Got get this area painted before I more any farther. 

Here my track plan:

Have a happy and safe 4th of July!

Wednesday, July 2, 2014

Lower Deck work and weathering

Been busy this week in completing some weathering work for a client and starting on the end of my lower level.  The weathering encompassed several freight cars with varying weathering.  I even got a few of mine that have been sitting on my desk waiting for a weathering job.  Here are some of the cars:
MCBT #8279  The rust spots are the Weathering Solutions decals.

MCBT #8293

MCBT #8235

MCTR #1252

MCIS #1603

BN #450995  One of mine.

ACFX #47104  

AR #1559 Another one of mine.
Completed 97% of the lumber cuts this afternoon for the last leg of the lower level.  The town of Orange, VA will be depicted in a small "L" shaped area.  No luck on the track arrangement.  I like to piece it together on the bench work for a plan.  I'm going to have to get really creative here.  I need a run around track bad.

Brackets for the bench work.
I put the lights in.  Seeing how it looks.

Final layout.  Now to get the track workable!



Wednesday, June 25, 2014

Settling back into summer modeling

Last week was the first week off for me as a teacher this summer.  I really did not get a break as I had a track camp for little kids most of the week, a summer school workday Friday and a train show Saturday.  Quite busy.  This week started off with a project for a client of mine I have done cars for the last few years.  I'm about half way done with his cars.  I have found some time to work on my layout a little and added a new signal to BY and weathered a old freight car.  I got my lumber and materials for the end of the lower level and I have waited to do after the freight car batch.  That is my top priority now.

I sold a lot of my On30 items at the train show Saturday and picked up a few items of need.  I did find a guy selling signals and I knew I need a few more.  I had to replace the 3 over 3 at BY because I accidentally shorted out a few included all important red.  So that needed replacement.  On a whim I bought a B&O cpl that I was thinking I would put on the Orange line.  But why not BY?  it looks good.  I hooked all my signals to toggle switches to be changed by the dispatcher.  That's usually me.  Makes it a little more operational.  This one I hooked up to 2 toggles so that I could use all the position lights.
In with the new, out with the old.  I moved the signal back a bit for switch possibilities.

Medium Approach

Stop

Approach

Approach medium
 I'm not a signal expert but the above signals are from a web search of B&O cpl signal meanings.
Signal aspects of the B&O Railroad
Tried a different method of weathering today.  Almost done but needs to be darkened a bit.  A boxcar you do not see everyday!

Monday, June 16, 2014

Monday Musings

I am finally starting to get back into modeling since my usual hiatus that I have in the spring.  I got into the layout room some on Saturday and really got moving in there today.  Got a little heat wave coming so I will be hunkering down inside with the AC!  I will be up at Timonium, MD this weekend selling most my On30 items and some HO stuff with Norm Wolf on Saturday.  If you never have been to one of the shows at Timonium, what are you waiting for?

Now some updates:
Did some reporting mark updating.  The Virginia Midland's reporting marks are VMID.  I've updated a few here:
Custom 2 bay hopper chopped from an Atlas cylindrical hopper.

A custom run from Intermountain I found at on Ebay.  I just had to have it.

My desk has seen better days.  Still adjusting to the smaller surface area.

VC #106 is getting closer to being finished.  Only needs the horn, antenna and weathering.


Tuesday, June 10, 2014

Summer is upon me!

Well, most people get excited about the summertime because of the warm weather and heading on vacations.  I get excited because I get a lot of time off (since I am a teacher) and I am not as busy as I have been with teaching/coaching.  Well that time is upon me.  We finish up school this week and I got a million projects slated as usual this summer.  I got several freight car/locomotive projects sitting on my smaller desk right now.   None of them are really calling my name right now.  I do have some cars to do for customer of mine so that project will move to the top.  After that, my main objective is to complete my track on the bottom level.  This mainly consists of the town of Orange.  I'm also going to redo right above Orange where my sand unloading operation is.  I have a better option for silos and removing track is needed.  I hope to make that trackage a little better.
This is a pic of under the layout.  The trackage is laid to the far corner.  This area will be a shadow box with a possible wye.

Here is an overview of were Orange will be.  I'll have to move my junk holder on the shelf.  I also want to redo the sand hopper unloading area above.  I may knockout 2 birds with one stone here.  Might even take out the river scene.  This is some of my first scenery and while most is fine some of it, like the ballast sucks.

I always like how this scene turned out. 
Last area to finish on the top level is near the team track.  Might just put some more trees in on a bluff.

My newest train show find.  Picked it up for $35.  This RS36 will be the new VC power replacing the GP35's for now.  Hope to finish it this week.