Welcome!
This site is dedicated to my model railroad, the HO scale Virginia Midland Railroad. This layout comprises a 12X9 room with two levels. The upper level is complete and the lower level scenery has just begun.
I do a handful of train shows in the Virginia/Maryland region with Makin Tracks. I also can help you find that freight car/locomotive or other hard to find item.
Email: virginiamidlandshops@gmail.com
You tube videos: http://www.youtube.com/user/Virginiamidlandrr/
I do a handful of train shows in the Virginia/Maryland region with Makin Tracks. I also can help you find that freight car/locomotive or other hard to find item.
Email: virginiamidlandshops@gmail.com
You tube videos: http://www.youtube.com/user/Virginiamidlandrr/
Showing posts with label signals. Show all posts
Showing posts with label signals. Show all posts
Monday, February 22, 2016
New Video: Installing working signals on your layout
I've had a few emails over the last year asking me about my working signals on the layout. Well, the last email from Philip H. got me motivated tot do a how-to-video. I get turned off with the block detection and JMRI concept of controlling the signals. Lots of work to get it to operate and expensive components. I've added toggles on my fascia to control the signals on the layout. Adds another component to running trains! Let me know if you have any questions!
Wednesday, June 25, 2014
Settling back into summer modeling
Last week was the first week off for me as a teacher this summer. I really did not get a break as I had a track camp for little kids most of the week, a summer school workday Friday and a train show Saturday. Quite busy. This week started off with a project for a client of mine I have done cars for the last few years. I'm about half way done with his cars. I have found some time to work on my layout a little and added a new signal to BY and weathered a old freight car. I got my lumber and materials for the end of the lower level and I have waited to do after the freight car batch. That is my top priority now.
I sold a lot of my On30 items at the train show Saturday and picked up a few items of need. I did find a guy selling signals and I knew I need a few more. I had to replace the 3 over 3 at BY because I accidentally shorted out a few included all important red. So that needed replacement. On a whim I bought a B&O cpl that I was thinking I would put on the Orange line. But why not BY? it looks good. I hooked all my signals to toggle switches to be changed by the dispatcher. That's usually me. Makes it a little more operational. This one I hooked up to 2 toggles so that I could use all the position lights.
I'm not a signal expert but the above signals are from a web search of B&O cpl signal meanings.
Signal aspects of the B&O Railroad
I sold a lot of my On30 items at the train show Saturday and picked up a few items of need. I did find a guy selling signals and I knew I need a few more. I had to replace the 3 over 3 at BY because I accidentally shorted out a few included all important red. So that needed replacement. On a whim I bought a B&O cpl that I was thinking I would put on the Orange line. But why not BY? it looks good. I hooked all my signals to toggle switches to be changed by the dispatcher. That's usually me. Makes it a little more operational. This one I hooked up to 2 toggles so that I could use all the position lights.
| In with the new, out with the old. I moved the signal back a bit for switch possibilities. |
| Medium Approach |
| Stop |
| Approach |
| Approach medium |
Signal aspects of the B&O Railroad
| Tried a different method of weathering today. Almost done but needs to be darkened a bit. A boxcar you do not see everyday! |
Tuesday, August 13, 2013
Scenery rush and another dilemma
Last night I finished ballasting all the mainlines on the VM. I just glued it down a few hours ago. It feels good to finally seeing this layout getting finished. At least for the ballast! I also put in an order to Scenic Express for a some grass mats and other items. The only ballast I have left is two spurs that have no industries on them.
| Add all my switch timbers last week while waiting on the wrong ballast. |
| The turnout at Old Dominion Foods works great. |
| Virginia Central trackage is drying. Real stone ballast will always be darker when glued down. |
| The VM mainline is complete with ballast. The spur to the right will be a pulpwood loading area on the VC. |
| Another view from the Battlefield Yard area. |
| I also did some work on the Battlefield yard crew house. I used Monster Model Works concrete sheets for the parking lot, Cannot wait to add the rest of the details. |
Tuesday, July 30, 2013
Operational Session with Norm Wolf
Yesterday I had a planned operational session with Norm Wolf on the layout. He's been wanting to come over for a while now and yesterday our schedules worked out. He ran the V100 which runs out of Battlefield Yard (BY) to the Fredericksburg Flats industries. He took 8 cars with him and returned with 8 cars. Not an easy task but Norm did well. The flats have 3 trailing industries and 3 that require you to run around your train. The layout acted up a little but 80% was operator error (running through switches). You can guarantee that your layout will have some shorts, a derail & a pull apart when you want to show your layout to someone. It's Murphy's law! This stuff never happens when it's just me. I ran the other trains that came out of staging to BY and did the switching in BY. We ran a total of 3 trains on the layout. The V100, a G200 grain train from Orange and the F&NN local. Here are the pics:
Some of Norm's pics:
| RF&P #124 brings in the rest of V100 train. Norm had to wait on their arrival before he could head to Fredericksburg Flats. |
| F&NN power brings their small train (3 cars) into the Battlefield yard. |
| Norm catches up on paper work while the F&NN train passes. He had to clear up for the train heading east. |
| RF&P #124 has it's train assembled behind him. The G200 power waits in BY for it's next assignment. A H/W load sits on the engine track. |
| Norm finishes up his switching since he has no other trains coming through his switching. |
| RF&P #124 gets an approach signal to leave Battlefield yard. |
![]() |
| It's me switching in BY. |
![]() |
| A B&O sand hopper bound for the VC. |
![]() |
| The G200 grains train prepares to run around it's train. The VC depot is in the foreground. Norm's engine #281 sits in the upper left corner and in the clear of G200. |
![]() |
| The BY engine track has a high & wide waiting on it's assignment. |
Monday, July 22, 2013
West end signals are installed and working/ other projects
Finished up the last signals on the layout over the weekend. All my signals are controlled by toggle switches on the fascia. Since op session only consist of 2 people, I'm the one who will throw them. I installed 2 Tomar regular 3 light signals and one BMLA searchlight signal. The 2 Tomar signals are going into Battlefield Yard and the other is right across the track going west to Orange (hidden staging). The searchlight signal is different and controls trains coming off of the Virginia Central branch line.
The other pictures are other things I'm working on this week:
The other pictures are other things I'm working on this week:
| The two Tomar signals. There will be another bridge between the signals and the other overpass. |
| These BMLA signals are very detailed. Definitely different on the layout. |
| A high and wide load. Gotta have a interesting load during some op sessions. Finally got the brass wire I need for tie downs. |
| A side dump for a MOW train. Gotta get some VMID lettering on it. |
| No this is not HO but an On30 Forney getting a new tender. One more good days work and she will be complete. Maybe 2 with the paint! |
Wednesday, January 30, 2013
Short Video of my new signals
Here a little teaser video from my layout. Not big fan of showing unfinished areas on videos by wanted to show that working signals do add a lot to a layout.
Sunday, January 27, 2013
Soldering and signal frustration
Well after about a month or more of doing other things, I decided to install more signals on the layout. This did not seem to be a long task but a tedious one. My signals at the crossing have been put in for a few years now. I installed them with on-off-on toggle switches. I did the same with these. These toggle switches have 6 connectors in the back to connect the correct wires. I did myself a favor and ran the 2 main power wires all the way around the layout when I first thought about the project. So that was done. Those connect in the middle connectors on the switch. Then the LEDs are on one (with the correct resistor) and the common is on the other. Simple as that, right! Solder them in and your done right! Wrong! If the common and LED were switched connections, they would not work. I found this out the hard way. Soldering them in: not working, clip them in: working. I went through toggle switches. This was the obvious choice. Went out and got some heavy duty ones like the other switches. Then I found out about the common and LED thing. Talk about frustrating. I spent most of the day trying to get these to work! The positive: I did go several hours of soldering work without burning myself.
Soldering is something that if you are going to be in this hobby, you are going to have to learn. It used to be painstaking but I found something that makes it so easy. Tinning flux by Oatey is sold in Home Depot and other hardware stores. Before this, my soldering was bad but this makes it so easy. Put some on the end of the wire or connector and the solder bonds instantly. No preheating! I use and old soldering iron that has a little indention that holds my melted solder. Works for me! I use Micromark's Soldering Iron Stand instead of the little one that come with the iron. I use the same method on decoders and those expensive Tsunami decoders.
On with the progress:
Soldering is something that if you are going to be in this hobby, you are going to have to learn. It used to be painstaking but I found something that makes it so easy. Tinning flux by Oatey is sold in Home Depot and other hardware stores. Before this, my soldering was bad but this makes it so easy. Put some on the end of the wire or connector and the solder bonds instantly. No preheating! I use and old soldering iron that has a little indention that holds my melted solder. Works for me! I use Micromark's Soldering Iron Stand instead of the little one that come with the iron. I use the same method on decoders and those expensive Tsunami decoders.
On with the progress:
| My working (frustration) area above my desk. The signals would control exiting of Battlefield yard. Gator clips are great for testing connections. Lots of tedious soldering work. |
| This is the larger signal that controls the VM out of Battlefield Yard. |
| Red signals coming out of the yard. The one on the right is the RF&P connection that leads to hidden staging. Need to lean it to the right some |
| Toggles are set and the fascia did not fit back even but that might be for another day! |
Subscribe to:
Posts (Atom)



