Welcome!

This site is dedicated to my model railroad, the HO scale Virginia Midland Railroad. This layout comprises a 12X9 room with two levels. The upper level is complete and the lower level scenery has just begun.

I do a handful of train shows in the Virginia/Maryland region with Makin Tracks.
I also can help you find that freight car/locomotive or other hard to find item.

Email: virginiamidlandshops@gmail.com
You tube videos: http://www.youtube.com/user/Virginiamidlandrr/
Showing posts with label lower level. Show all posts
Showing posts with label lower level. Show all posts

Friday, June 21, 2019

Latest Video is out! New lighting and what’s next for the layout.


Wednesday, July 25, 2018

Finally, some much needed layout work

Finally got to a good stopping point on work bench projects and turned my focus to the layout.  I'm working mainly on the structures on the Parker area and have turn my attention to the St. Just area just across the aisle also.  Parker is a on the lower level where the passing siding ends/begins.  It's a very rural area and I wanted to keep it that way.  Somehow a huge industry, the OSB plant worked it way in the area.  But it's a perfect industry for this rural area.  I finally painted the main plant building but still have a long way to go with the plant.  The highlight of the Parker area will be the small depot there.  It's 98% done and looks perfect for the area.  I also started to cut foam for the land forms for the area.  These will mainly support trees that will help hide the hole in the wall that leads to the helix/staging.

Foam in place to hold trees that will block the hole in the wall and hide the continuous run track.

St. Just on the the other side of the isle will have it's industry on this bluff.  I will add a retaining wall and an elevator to haul up fertilizer from the tracks.

The OSB plant an it's new paint.  It will be a huge plant when complete.  

The Parker depot looks right at home.  Once the foam has trees, it will be hard to see the hole in the corner.  This will be a very photogenic area.  


Sunday, April 29, 2018

Model railroading and Spring don't go together

As we approach the month of May here in Virginia, it seems winter is still holding on by a thread.  I've spent several evening baseball practices this month watching my boys, freezing from the wind.  Looks as if we will finally be past that this week as Thursday is calling for temps near 90.  The good thing is that I just cut grass for the first time last weekend!  So, that gets me to model railroading.  For most of us, it takes a back seat this time of year.  We have so many things to do around the house after winter, there is hardly any free time.  Throw in three kids 12 and under, and you time is very limited.  I have not accomplished a whole lot, but mainly have gotten started on a few things.  I finally have figured out my favorite part of the hobby, building locomotives.  It seems that I am always in the middle of one of those projects.  You will see, I am actually in the middle of several.  Plus I have a few in the my storage drawers that are about 80% done!  Plus with a train show just about every month, that gets me shopping and thinking of future loco projects. Anyways, on with my pictures:
Should have seen my work desk before I cleaned it.  Just got the big stuff off.

My RS3M "Dewitt Geep" project.  Not happy with the color or the hand railings.  I will paint this Conrail blue and patch it for VMID

This a Proto 2000 chop nose Geep I got from a good friend.  The hard work is done, just have to check the drive (Proto crack gear issues) and decide on a paint job.  

An Intermountain GP10 painted in the MidSouth scheme.  I will patch this for the VMID.  Already has Lok sound installed and in VMID colors

Bad habit: For me, piling up stuff on unfinished scenery is a norm.  As you can see, not much time in the office tends to add more piling up.  I need to get the scenery done on the lower level!

Tuesday, January 2, 2018

First post of 2018

I had hope to get some work on the layout done on my winter break.  That sorta happened.  I replaced the bridge that hides the hole in the wall to the helix/hidden staging with a wider one.  I also want get started with scenery building in Parker but that lead to a newer future project: a large lumber facility.  Trackage could have been laid by now but I had to order a #4 turnout for the tank car spur. 

Let's get some pics going:
Here is the area the bridge will be replaced.  I had a narrow two lane bridge.

My good friend Greg McComas did some sketches for the OSB (oriented strand board) plant or one that makes
particle board.  It will receive woodchips and tanks of resin and ship the lumber.  
This will be the layout of the trackage of the plant.  The sharp curve with the arrows are the mainline.

The bridge was built from sheet styrene and left over Rix bridge pieces.   This was before I painted the underneath gray.  Why mismatching under pieces?  This part won't be visible.  

Footers had to re-dug to fit the next bridge supports.

Other footers done.

Here's the new bridge in all it's glory.  Decided to add stripes with decals.  That still needs to be done.


Thursday, December 21, 2017

Latest Update Video is out.

Here's my latest video fresh out of the computer and I-phone.  Just a look at the next scene I'll try to get done on the lower level.




Thursday, September 28, 2017

Update video

Here's a video I did this week reviewing my new motive power and a new industry on the lower level:

Tuesday, March 14, 2017

A snow day: Time for some layout work!

The last three weeks have been quite busy for me.  Work on the layout has been nonexistent, except I did get the hole cut in the wall two weeks ago.  I followed up with track and a turnout install on Sunday.   That's been it!  Today, I was fortunate to get a day off of work and I got a few things done on the layout.  Most of my work today was in the garage, beside the helix.  My last post on the lower level track work is here and a great lead into today's post:
http://virginiamidlandrr.blogspot.com/2017/01/monday-evening-track-work.html

Today was track work intensive.   I continued the passing siding through the wall and onto the platform that supports the helix.
Here's the new entrance to/from the helix.  Decided to put a passing siding in to help alleviate traffic going into Battlefield Yard.


Woodchip hopper checking clearances

The view through the hole.




After adding the track in the garage for the passing siding, I decided it was not long enough and wanted to make it longer.  So I added more flex track and curved it make it more than enough.  Work would have continued but I ran out of small screws that hold the track in place.



Test fitting the passing siding 

My door to cover the hole when not in use.

Original plan

My work area on the helix platform.

The long passing siding and through track will now curve around to give me plenty trackage.

Monday, January 23, 2017

Monday evening track work

Not a whole lot happens on the Virginia Midland on the weekdays, but I've been trying to get better during the week to get a few things done if possible.  Thirty minutes to an hour is what I try to squeeze in if possible, per day.  Tonight, I continued to get the new trackage down to at least get trains running again.  Trying to get the best possible plan is always fun.  I have not changed much, but the tedious work continued.
Nothing new here just upgrading roadbed and adding a longer Tortoise wire.

Had to move the desk out to get to what I was working on.  It's nice to be sitting down to work!

This is my main work area right now.  Many tools are a necessity for track laying.  




The boxcars are on the continuous run track and a leg of the wye.  The straight track towards the wall will lead to the helix.  That track leading to the helix will also have a passing siding.  

Overall view of the area I'm working on.  The turnout on thr bottom of the pic goes to an industry spur.  I had to move the bridge too.  The background on the right will be replaced also.  

Sunday, September 18, 2016

Finally time for a September post


Can't believe this is my first post this month but it's been busy.  I've been back to work for the last 3 weeks and the boys are in full swing in fall baseball.  Seems like I need to make some short bursts of modeling if I'm gonna get it in.  I did surprise myself and got some layout work in on the first week of school.  This is on the lower level in St. Just.  Not sure exactly what I have planned for it.


Yes those wires are organized!

Fascia installed

A backdrop and trees will block the view in the hidden trackage.




Thursday, August 18, 2016

Layout update: scenery is complete on the upper level

Finally finished the scenery on the upper level.  I redid the scenery in the corner the cat destroyed a few months back.  I also completed the last "bare plywood" in the VC area.  This area has been voided of scenery for a number of reasons.  Main reason: it was a repair/maintenance spot.  But it's done!  Now you are wondering what got me into high gear.  I had people coming by to look at the layout today.  Nothing like a deadline to get you going!
Land form for the replace corner near BY.  The foundation is blue foam and the tan is 2" foam.


Basic scenery on the foam.  It's nice to do this where you want then add it to the scene.
Scenery mound in place




Decided to add some rocks.  These were made with plaster and molds.


Rocks have been hot glued in place now time for bushes, trees and the like.

The cabin and the truck have been put back in the scene.  Most of the trees have been reused.

Close up of the cabin in the woods.  Definitely a rail fans dream!


Thought I had completed the final track for this layout and I look like I'm headed down a redo of the lower level.  Not a total redo but one that will make the layout flow.  It includes a lift-out crossing and staging near the helix.  A wye will be put in to have continuous running on the lower level.  I will also redo the town names mainly switching them around.
Rough sketch of the new track plan for the lower level.

Sunday, March 6, 2016

Various work happening on the Midland

Spent the last two weeks doing multiple things in the office.  This includes weathering for a client,experimenting with Pan Pastels and working on a new industry.  Here are my progress photos:

Here's the smaller elevator I chose to add to Orange.  Like most Walthers buildings, they never go together well.  Had to add putty to the seam.  Even though it's a smaller elevator, it barely fits between the levels.

Here it is squeezed between the levels.  The lower level was never planned for the layout and just kinda happened.  I would like more room between the levels but it works fine for ops.

As you can see, I had move the elevator spur.  This gives plenty of room for the structure.  The closest track will be the Norfolk Southern interchange.

May have to change the lights in this area.  Wiring needs to be stapled up.

Some grain hoppers spotted. Will add a grain bin or two to the scene along with a office.   


A new gondola for the Midland.  Been wanting to do a gon with VM spelled out and finally got around to doing one.  This is an Atlas 53 footer.  It definitely needs to be weathered and a tie load added.

This is a Ebay win about a month ago.  It's an old Sylvan resin kit that was totally assembled.  It's an Ex-CP paper boxcar but will enter a second life on the Midland.
 TrainMasters TV from MRH has been running a great weathering series from Mike Confalone in the last month.  He's been  weathering various cars with oils and Pan Pastels.  I finally broke down and bought some back at the February Timonium show.  There not cheap but shop around to find the best price.  Finally tried them out and they work well.  Worked with the Pan Pastels and some oils to weather a Bowser 100 ton Reading hopper.  This was my practice hopper and it turned out quite well.  I'm planning to add CSXT reporting marks and put it in service.

My oils and Pan Pastels working space.  

My results from oils and the pastels.  I like it!