Welcome!

This site is dedicated to my model railroad, the HO scale Virginia Midland Railroad. This layout comprises a 12X9 room with two levels. The upper level is complete and the lower level scenery has just begun.

I do a handful of train shows in the Virginia/Maryland region with Makin Tracks.
I also can help you find that freight car/locomotive or other hard to find item.

Email: virginiamidlandshops@gmail.com
You tube videos: http://www.youtube.com/user/Virginiamidlandrr/

Wednesday, August 6, 2014

Video update of progress

Uploaded a You Tube video on my progress so far on the layout. This covers the expansion on the upper level and the entire lower level.  I'm reworking the track on the Mine Run Branch in the sand loading spur.  It will give me more space for dropping and picking up cars.   As always, if you have any questions, don't hesitate to email me or comment below.

Monday, August 4, 2014

Fascia, Fascia Fascia

Wow, am I tired of cutting, painting and installing fascia.  It seems it is all I have done since the last blog update.  My original fascia color I went with was a bright green, like the one on the Midland locos.  I did that on a whim.  When doing the new fascia on the extension, I went with black, a more neutral color.  You want the focus of your railroad to be on the layout not the fascia.  So I had to remove all the painted fascia and paint it black.  This sounds easy but I also moved DCC plugins to the lower level.  So that meant new fascia. I also did some sky blue background painting.

I'm also looking to move toward wireless NCE controllers.  I would mail my controllers to NCE and they would install the wireless capabilities.  I would need to buy an antenna and that would be it.  It costs $97 and would be a turnaround of 2-3 weeks.  I would have to send my Power Cab first since this is main controller.  That means I would not be able to use the layout for 2-3 weeks :-(
I'll probable do it later on this month.  If any subscribers have wireless NCE, email me or comment below the pros and cons. Until next time!
Here's the entrance to my layout room.  New black fascia for the extension and lower level.

Here's my switch panel for the 3 switches in Orange/  Need to put in the track arrangement so I'll know what button is what.  




Here is Orange ready for scenery and buildings.  The blue wall on the right is removable in case I need to access this area.  Will need to for scenery!  

Here is Orange looking toward the untreated tie loading area.

To the left in Orange is the interchange tracks.  

On the upper level, a bridge with a road coming down to the tracks will highlight this area. 

Across the room, I added some paint to the backdrop.  I've decided to put in corn syrup unloading facility in the spur where the tanks are spotted.  This area is called St. Just (based on a real town on this former line) where the Mine Run branch starts.  

A little bit of traffic at St. Just.  Ex-KCS power is doing some testing on the Orange line.  

Here's one of the NCE plugins I moved from the upper level.  St. Just also has a switch panel for the 4 switches here.


The upper level extension looks like its ready for it's scenery.  I'm ready for some too since this fascia has been kicking my butt!

Wednesday, July 30, 2014

Mid week update: July 30th

Progress has been slow this week because of chores around the house and other things.  I've got a little done but this has turned into alot more than I thought.  The track is totally done and wired and the turnouts in Orange have switch machines attached and wired to push buttons.  Unfun things like cutting and painting facia are about all that remain.  But since those items i just listed are unfun, I drift off to other items like backdrops and a untreated tie load.

I did some research on printing out backdrops on your own.  I was going to take the pics myself but my camera (about 10 years old) is less functioning than my I-phone one.  So, I found some high resolution pics I could use on the web.  Used a mirror image on a few and I have several pics I can use on the lower level on the branch line.

I also experimented with a untreated tie load and found some pics on the web of them in gons.  So, I used a piece of blue foam and cut it to the size of the gon. This takes up most of the space in the gon.   I then cut up match sticks to tie size(gon width).  I cut several different notches in the foam to represent uneven ties.  Paint the foam a tan color and then glue in the ties.
This untreated tie gon turned out well.  I need this for my untreated tie loading facility in Orange.

The load out of the gondola.
Examples of the printed backdrops.  This trackage is in front of my work desk and is very thin.  The hole in the wall leads to the helix in the garage.

Examples of the quality of the prints.  Some lights in this area might help.  It's on the "to do" list.  Printed out some different ones tonight.
My travels Saturday took me through my favorite railfanning spot since I was a young kid.  Doswell, VA always has engines sitting in the yard area.  Buckingham Branch has their engines here now and is typical for a short line like the VMID.  

These "plugin" receptacles are a nice added feature that can be easily added to the Midland. 

Sunday, July 27, 2014

Op Session yesterday and a railroad map of the Virginia Midland

Visited Mike Pulaski's model railroad, the Mohawk and Hudson near Richmond yesterday.  This is the second time I have visited his amazing double decked layout in his basement.  He models about the same time period as me( mid 1990's).  Most of his crew did not show up but that meant more trains to run!  If I were to ever get house with a basement, his layout is the perfect size.  Not too big and not too small.  Did not take a bunch of pictures, but here are a few:
This was a stack train I ran all the way around the layout.

His backdrops set the upstate New York scene.


This is a great looking feed mill on the upper deck.


Gotta love some Susie Q!
Here's a map of the railroads of Virginia.  CLICK ON IT FOR A LARGER VIEW.  The VMID trackage runs west out of Fredricksburg to Orange with the Mine Run branchline in western Spotsylvania County.  The F&NN trackage runs east out of Fredericksburg.  The F&NN trackage is not modeled on the layout.  

Friday, July 25, 2014

Upper and lower level work continues

I've slowed down a bit on the work I've down this week.  Lots of tedious work the past couple of days like backdrop cutting and a shelf on the end of the extension.  I've completed all the track work on both levels and still need to add feeder wires to the track.
Attaching track.  I don't add subroadbed because this a branchline.

My end shelf.  Need to add another shelf and paint it black.


Trackwork complete.  I came back and super-elevated the closest curve.  I also added n-scale subroadbed to this curve which is not shown.

Another view of the trackage.

These sand hoppers test out the trackage.



The lower level trackage is done.  The CSXT boxcar sits on spur MOW spur.  To the left will be a older railroad building.

The gondola sit in the untreated tie loading spur.

The two spurs to the left are the VMID and NS interchange tracks.  The double ended train will bring 4 cars down and drop the lead engine where the boxcar is and then drop the cars in the interchange on the left..  Then pick their cars up and head back to Fredericksburg.

Had to cut into the the benchwork to get this unloading pit in.  Of course I forgot about it until I installed it!

Tuesday, July 22, 2014

Bench work on extension is almost done and bigger horsepower

Well this expansion has turn into more work than I hoped but should improve the look and operation.
I have totally revamped the trackage in this area that was once complete.
Major changes:
  1. Gotten rid of a bunch of trackage at the aggregate facility including a run-around track. 
  2. I have also bent the VMID trackage that once went across the bridge to a cassette.  
  3. I have configured the track below without the use of a cassette there.
  4. Opened the layout up for more scenery.
Horsepower update at the very bottom.
Pretty much starting from scratch with this area.  

Had to add a smaller board up front to aid in accessing the lower level.

Mocking up the track work.  I use sectional 22 degree curves to plan curvage.  The 22 degrees is not to sharp and is usually my smallest radius.  This works well for layouts with 4 axle power and no passenger trains.  

The look towards the door.  The trackage on the left is the VMID.  I have to move the signal to the mark on the benchwork.

The aggregate unloading facility base.  It should hold 5-6 cars across the diamond.

Glad Walthers finally made one of these. I was close to making my own silos.

After today's work.  Bench work is just about complete.  Got to install the lights underneath for the lower level before I attach the subroadbed.  

Another view

Final view from the door.
And finally some bigger horsepower for the VMID.  She will be patched and put into service soon.  

Monday, July 21, 2014

Work on the upper level starts

Just like my work desk, I have to have several projects going on at one time.  My layout is no different.  The lower level has come to a halt and I have moved to the upper level expansion.  I ripped out the bridge and river scene last night.  Amazing that it takes you days to do a scene and only minutes to rip it out.  This area represented some of my first scenery applications on this layout.  I did a decent job on it. I was mainly unhappy with it because of the track and ballast.  It did not look good and why did I ever use sectional track?  Most of the trackage on the VC in the old aggregate area is being removed.  The spur to the elevator will remain.  I will add another crossing to the VMID trackage to access the new expansion.  I will curve the VMID trackage toward the door and the removable cassette will no longer be needed.  It's alot more work but will look good when complete.
This scene is now gone.

Saving what scenery I can.  The VMID mainline between the signal and the electrical box will be curved now.

Popcorn and hard shell scenery made the hill side along with some plaster rock outcroppings.  

The river scene is no more.


Now time to rip out the track and ballast.

Thought I was done taking out track and ballast but since this is a difficult trackage with a crossing, I will have to rip out almost all of it.