Here a little teaser video from my layout. Not big fan of showing unfinished areas on videos by wanted to show that working signals do add a lot to a layout.
Welcome!
This site is dedicated to my model railroad, the HO scale Virginia Midland Railroad. This layout comprises a 12X9 room with two levels. The upper level is complete and the lower level scenery has just begun.
I do a handful of train shows in the Virginia/Maryland region with Makin Tracks. I also can help you find that freight car/locomotive or other hard to find item.
Email: virginiamidlandshops@gmail.com
You tube videos: http://www.youtube.com/user/Virginiamidlandrr/
I do a handful of train shows in the Virginia/Maryland region with Makin Tracks. I also can help you find that freight car/locomotive or other hard to find item.
Email: virginiamidlandshops@gmail.com
You tube videos: http://www.youtube.com/user/Virginiamidlandrr/
Wednesday, January 30, 2013
Sunday, January 27, 2013
Soldering and signal frustration
Well after about a month or more of doing other things, I decided to install more signals on the layout. This did not seem to be a long task but a tedious one. My signals at the crossing have been put in for a few years now. I installed them with on-off-on toggle switches. I did the same with these. These toggle switches have 6 connectors in the back to connect the correct wires. I did myself a favor and ran the 2 main power wires all the way around the layout when I first thought about the project. So that was done. Those connect in the middle connectors on the switch. Then the LEDs are on one (with the correct resistor) and the common is on the other. Simple as that, right! Solder them in and your done right! Wrong! If the common and LED were switched connections, they would not work. I found this out the hard way. Soldering them in: not working, clip them in: working. I went through toggle switches. This was the obvious choice. Went out and got some heavy duty ones like the other switches. Then I found out about the common and LED thing. Talk about frustrating. I spent most of the day trying to get these to work! The positive: I did go several hours of soldering work without burning myself.
Soldering is something that if you are going to be in this hobby, you are going to have to learn. It used to be painstaking but I found something that makes it so easy. Tinning flux by Oatey is sold in Home Depot and other hardware stores. Before this, my soldering was bad but this makes it so easy. Put some on the end of the wire or connector and the solder bonds instantly. No preheating! I use and old soldering iron that has a little indention that holds my melted solder. Works for me! I use Micromark's Soldering Iron Stand instead of the little one that come with the iron. I use the same method on decoders and those expensive Tsunami decoders.
On with the progress:
Soldering is something that if you are going to be in this hobby, you are going to have to learn. It used to be painstaking but I found something that makes it so easy. Tinning flux by Oatey is sold in Home Depot and other hardware stores. Before this, my soldering was bad but this makes it so easy. Put some on the end of the wire or connector and the solder bonds instantly. No preheating! I use and old soldering iron that has a little indention that holds my melted solder. Works for me! I use Micromark's Soldering Iron Stand instead of the little one that come with the iron. I use the same method on decoders and those expensive Tsunami decoders.
On with the progress:
| My working (frustration) area above my desk. The signals would control exiting of Battlefield yard. Gator clips are great for testing connections. Lots of tedious soldering work. |
| This is the larger signal that controls the VM out of Battlefield Yard. |
| Red signals coming out of the yard. The one on the right is the RF&P connection that leads to hidden staging. Need to lean it to the right some |
| Toggles are set and the fascia did not fit back even but that might be for another day! |
Sunday, January 13, 2013
Saturday Operational session on the VM & VC railroad
Here are the highlights:
| Kevin Olson gets his train ready VM100 to leave Battlefield Yard. His cars for Fredericksburg Flats take up two tracks. |
| These sand hoppers are ready for the Virginia Central to pick them up. |
| The yard power switching some freight in the yard. That's the On30 layout below. |
| An RF&P GP40 #124 brings in a cut of cars for Battlefield Yard. VM #281 rests the engine yard track. |
| VM GP11 #280 clears up for the incoming RF&P train. |
| The RF&P engine waits in track 5 for a empty stone train. The VC has made an appearance and places it's caboose on the end of it's hopper cut. They ran over to the yard caboose light. |
| VC #3 brings in 7 full sand hoppers into their trackage. |
| The rock train has came in from the Orange line and must run around it's train to get into Battlefield Yard. CF7 #256 leads #292 as they prepare to leave the VM siding. |
| Here are some of the rock cars on VMW200. The caboose is now at the front. It's entering Battlefield Yard. |
| The RF&P leaves with it's empties to hidden staging. The overpass hides the hidden staging "hole in the wall". Those buildings are not intended to go there but they do look good on the bluff. |
| The Orange turn VM150 has run around it's train and heads to Battlefield Yard. U23B #289 leads this 4 car train. |
| VM100 (Kevin's train) has finished it's work & prepares to leave the Flats and head to Battlefield Yard. It's now lead by the B unit. The VC yard is look crowded! |
| The VM100 power now leads the Orange turn. VM150 is preparing to run around it's train to head west. |
Sunday, December 30, 2012
An Extension on the On30 layout
Well ever since I visited Mark Chase's layout 2 weeks ago, I started doing some On30 stuff . I don't know what it is about narrow gauge but it has me hooked. I have been doing On30 for about 3 years. Your probably wondering why I am talking about a On30 layout when you thought I was a HO guy. The On30 layout is directly under Battlefield Yard. I have On30 trackage that was in front of my workbench\ that was staging for the On30 layout. Instead, I took that trackage and put in a 13" by 5' extension. It will consist of a small one track yard, a lumber mill and another industry or engine house. Look back on some of my previous posts about a year ago for my On30 layout.
I worked most of the last 3 days on it and I am using 2" pink foam for a base. The framing and the angles are what took so long. I also had to rework wire connections on the Midland so that they would not show on this extension. That was no fun. In all it is going to be very rewarding. I can actually sit in a chair and work this layout. Who has a choice when wanting to run trains? Most do not! Here are some pics of the my work ( or mess):
I worked most of the last 3 days on it and I am using 2" pink foam for a base. The framing and the angles are what took so long. I also had to rework wire connections on the Midland so that they would not show on this extension. That was no fun. In all it is going to be very rewarding. I can actually sit in a chair and work this layout. Who has a choice when wanting to run trains? Most do not! Here are some pics of the my work ( or mess):
| Here's a shot in the middle of the mess. Foam is set. |
| Need to add the new fascia and the NCE jack for the Midland. |
| A messy workbench is always a good sign! |
| The space is not ideal but it works. I plan on powering all the turnouts with Tortoises. |
| Working a track plan. This my preference in working out a plan. |
Tuesday, December 18, 2012
Industry Tour Part 2: Specialized Beverage
Continuing on my industry tour on my layout. This week I will show you Specialized Beverage, a beer distribution company. The beer comes in from boxcars and goes to the local stores via way of truck. This industry is on the Virginia Midland main industry spur where the VM's customers are located. The spur can hold up to 3 boxcars. The original building is Walther's RJ Frost. I cut the building in half and made it into a longer building. The logos were designed by Kevin Klettke. I even added a video of Specialized being switched at the very bottom.
| This industry is in a corner but fills the area nicely |
| Workers have their hands full unloading 3 boxcars a day here at Specialized Beverage. |
| The spur on the left is Mid-Atlantic Feed. MAF is served by the VM and VC. Nice Porsche by the tracks! Must be the owner. |
| Specialized Beverage with it's usual assortment of boxcars. |
Sunday, December 16, 2012
Op. Session on the Piedmont and East Blue Ridge railroad
I had the privilege to operate on Mark Chase's P&EBRR On30 layout yesterday. He has a great website and I advise you to check it out:
http://www.eastblueridge.com/
If you don't know, I got hooked on On30 about 4 years ago at one of the Timonium shows. It is a great scale and Bachmann makes some great locos and equipment. I have done a few things in On30, like modules but settled on a smaller layout under my current HO layout.
Mark's P&EBRR is based in the 1930's in Central Virginia and it mainly hauls soapstone in various states. There are also some other online industries. I have never operated on someone else's layout so I was somewhat worried. Plus, I have never used Digitrax DCC either. Well after about 5 minutes of operating, I was perfectly comfortable. Having a switching HO layout tends to help with all the movements. I worked the mill job which mainly switched the western end of the layout. I also got to do the transfer job which ran the entire layout all the way to the exchange to the C&O at Winwood and back. Most of Mark's scenery is not done but it did not matter. It is a well thought out layout and has long train runs and lots of switching.
What I really liked about the layout: (what I would like to incorporate in to my layout)
-Digitrax controller was pretty easy to operate
-Switches with DCC decoders controlled from the Digitrax controller
-Tortoise switch machines
-The hand painted backdrops
-the entire Winwood shadow box scene in the workshop
Or to sum it up, Everything!
I cannot wait to get back there. It was a real treat to operate. I did manage to take some pictures. Thanks for being such a gracious host Mark!
http://www.eastblueridge.com/
If you don't know, I got hooked on On30 about 4 years ago at one of the Timonium shows. It is a great scale and Bachmann makes some great locos and equipment. I have done a few things in On30, like modules but settled on a smaller layout under my current HO layout.
Mark's P&EBRR is based in the 1930's in Central Virginia and it mainly hauls soapstone in various states. There are also some other online industries. I have never operated on someone else's layout so I was somewhat worried. Plus, I have never used Digitrax DCC either. Well after about 5 minutes of operating, I was perfectly comfortable. Having a switching HO layout tends to help with all the movements. I worked the mill job which mainly switched the western end of the layout. I also got to do the transfer job which ran the entire layout all the way to the exchange to the C&O at Winwood and back. Most of Mark's scenery is not done but it did not matter. It is a well thought out layout and has long train runs and lots of switching.
What I really liked about the layout: (what I would like to incorporate in to my layout)
-Digitrax controller was pretty easy to operate
-Switches with DCC decoders controlled from the Digitrax controller
-Tortoise switch machines
-The hand painted backdrops
-the entire Winwood shadow box scene in the workshop
Or to sum it up, Everything!
I cannot wait to get back there. It was a real treat to operate. I did manage to take some pictures. Thanks for being such a gracious host Mark!
| The commuter train hauling workers west from the Meridan wye |
| The workers pass the Dust mill/ quarry job at Cove on the passing siding/run-around track. |
| My Mill job train clearing up for the Doodlebug at Shops Yard. |
| My locomotive for the Mill job is 0-6-2 #1, a custom loco with sound. Definitely different. |
| This train is the Transfer Job, holding on the main for the quarry job to clear up. |
| The entrance to Winwood in the other room. The hole leads to the wye and Meridan. The spur is Winwood Oil and coal. |
| The Transfer Job at Winwood with it's switching done and ready to head west. |
| A coal hopper and a lumber flat are today's freight. |
| Overview of Winwood left |
| Overview of Winwood right |
| The Transfer Job with outbound cars. The 2 boxcars and the gon are cars that were inbound. |
Sunday, December 9, 2012
Some more completed projects
Here are a few of my completed projects:
| Got this Idea from a recent trip to the local BJ's. These Rock trailers were owned by the RF&P at the end of their careers. This one was based off of one used as a tire trailer. |
| The trailer is an Athearn 45 footer. |
| VM #200 was replaced by GP11 #280. I wanted a high hood Geep on the layout. She has been rebuilt from the looks of the 4 stacks on the roof. Still need to weather her. |
Subscribe to:
Posts (Atom)