Switching lists can be a whole lotta of work. Lots of people use a car routing system with cards for every car. I think those car cards are too much work. I have even seen different color paper markers on top of freight cars. This makes having an operating session on my small layout too much work. I have no car cards and no filing system. My conductor uses a switching list, clipboard, pencil and a uncoupler. The switching list is made up and all I have to do is print one from my computer and we are ready to go. I simply write the cars at each industry and write what cars are going where. Makes it easy for me. I believe I got this from Lance Mindheim's website. Being a teacher, I want to stay away from paperwork as much as possible.
 |
Example of an older Virginia Midland switch list. Remember, I have 2 railroads on my layout. That means 2 separate switch lists. The VC switch list is a lot smaller and takes half the time. |
No comments:
Post a Comment